web_pharmaceutical

IDP assists in an expected savings of SGD3.1m for major pharma’s new biotech manufacturing facility

A biotech manufacturing plant has projected energy savings of 17.2 GWh per annum, following the efforts made by its engineering department, and supported by the Integrative Design Process carried out by The GreenAsia Group. This could mean an expected $3.1m saved by the major pharmaceutical company each year. TGAG was commissioned by the company last Read on…

ir_project_accolades2

International Rectifier Singapore Pte Ltd, Kaki Bukit Techview opens with higher than expected projected savings

International Rectifier Singapore aimed to reduce projected energy consumption at their new wafer fabrication processing facility using IDP. They now expect to better their results after applying the IDP. A saving of 40% of their energy bill from IRSG’s baseline calculation which was based on their manufacturing load is expected after the IDP. Ongoing monitoring Read on…

azem_bay_earth_morocco_ewb

Azem Bay, Casablanca

Located to the south of Casablanca, less than 45 minutes by car and 60 minutes from the international airport, the proposed Azem Bay residential development will be the first sustainable bioclimatic resort in Morocco. The resort will consist of a Country Club with 25 apartments and 56 residential villas, with direct access to the adjacent Read on…

1 2 3 4 5